Every project starts with an on-site evaluation of the ground conditions and available space. Virginia clay soil retains water, so the builder will assess sub-base depth and install a drainage layer before any concrete or asphalt is poured. Skipping this step leads to heaving slabs within a few winters.
The written estimate covers base preparation, surface slope, acrylic colour coat, backboard posts, and regulation NBA or recreational line marking as separate line items. Nothing is bundled into a single figure, so you can see exactly what each element costs before work begins.
A final walkthrough confirms the finished court matches the agreed scope, surface colour, hoop height, and boundary lines included. If fencing or lighting is part of the project, those are scoped at the same time so no costs appear mid-build.