Surface-Only Repairs
A new acrylic coat over a failing slab buys one season at most before the same cracks reappear.
Full Slab Removal
Breaking out the old concrete or asphalt exposes the real damage so the base can be rebuilt correctly.
Full Rebuild
Stop patching a failing slab, get a level, well-drained court built on a correctly compacted base.
What Goes Wrong
A new acrylic coat over a failing slab buys one season at most before the same cracks reappear.
Breaking out the old concrete or asphalt exposes the real damage so the base can be rebuilt correctly.
Pooling water after rain means the subgrade was never graded to shed water away from the playing area.
Surface slope is set during base preparation so water drains clear of the court before any slab is poured.
Virginia clay shifts with moisture and freeze-thaw cycles, cracking any slab laid on a poorly compacted sub-base.
A new aggregate sub-base is compacted to the correct depth for local clay conditions before the slab goes down.
Hidden base damage discovered mid-job inflates costs when fencing and drainage were never included in the original quote.
Demolition, disposal, base prep, surfacing, fencing, and line marking are costed together from the start.
Why Choose Us
Accountability and process, not promises, are what separate a rebuild that lasts from one that repeats the same problems.
Every enquiry starts with an on-site evaluation of the space and drainage before a single number is quoted.
Demolition, base prep, surfacing, fencing, and line marking appear as separate line items so you see exactly what you are paying for.
We arrange builders with hands-on experience in Virginia’s clay soil and freeze-thaw conditions, not generalist contractors.
Fencing and lighting can be added to the same estimate so the entire rebuild is costed and coordinated from one point of contact.
A final walkthrough is part of every job, the court is checked against the agreed scope before the work is signed off.
The Process
01
Submit your site details and a local builder is arranged to visit, check drainage, and assess the base condition in person.
02
You receive a written, itemised estimate covering demolition, base prep, surfacing, fencing, and line marking before any work begins.
03
Once the estimate is approved, the builder demolishes the old court, rebuilds the base, and completes a final walkthrough with you.
Pricing Estimates
| Job | Typical cost |
|---|---|
| Partial demo and rebuild | $10,000-$25,000 |
| Full court demolition | $15,000-$35,000 |
| Demolition and full reconstruction | $50,000-$150,000 |
Tell us the site and the sport. We’ll arrange a local builder to assess the ground and put the full scope in writing before anything is booked.